T-O Engineers Completes Boise Airport Hot Water Power System Upgrade
Boise Airport (BOI) recently completed a project which consisted of the replacement of three existing natural gas-fired hot water heaters within the Boise Airport terminal building with a new solar hot water system. The solar hot water system consisted of 12 rooftop solar thermal panels, a heat plate exchanger, two 300 gallon hot water storage tanks, and two new high efficiency gas water heaters. The design was completed by T-O Engineers and Musgrove Engineering of Boise, Idaho.